loading

GuangWei – Expert in Precision Die Casting and Advanced Metal Craftsmanship

How long does it take to build a mould?

Race at GuangWei Speed to seize opportunities in the ever-changing market!

Time is money, especially during the New Product Introduction (NPI) phase. Leveraging the efficient operations of our in-house mould shop, GuangWei is committed to minimising development cycles. We offer highly competitive delivery schedules based on mould complexity:

Simple Moulds: Development completed in just 2–3 weeks.

Medium Complexity: Typically requiring 4–5 weeks.

Highly Complex or Multi-slide: Even the most intricate moulds delivered within 5–7 weeks.

We understand market windows are fleeting. For Urgent projects, we can activate an expedited ‘green channel’ based on scheduling to accelerate processing, ensuring mould development never becomes a bottleneck for your project.

Tight deadlines? Email sales01@gwdiecasting.com to secure your schedule immediately.

How long does it take to build a mould? 1

prev
In collaboration with Guangwei, who holds the mould?
What quality standards does GuangWei follow?
next
recommended for you
no data
Get in touch with us
Guangwei is a professional precision die casting and machining manufacturer, integrating zinc, aluminum, and magnesium alloy die casting, mold design, CNC machining, and surface finishing into a complete one-stop solution.
CONTACT US
  Sales Manager: Brian Ding
  +86 133 7775 7142
  www.gwdiecasting.com
  No. 3, Shangzhen 2nd Road, Shangjiao Community, Chang’an Town, Dongguan, China.
Copyright © 2026 Dongguan GuangWei Communication Technology Co., Ltd. | Sitemap privacy policy
Customer service
detect